Рейтинг:
(0 голосов)
Артикул: 43
Рейтинг:
(0 голосов)
Артикул: 43
Общие характеристики
Специализация
Консультант SAP PO/PI/XI/ABAP
Локация
Москва
Иностранные языки
Английский, Турецкий
Формат работы
Работа из офиса, Удаленная работа
Работа в других городах
Готов (-а) к командировкам

Краткое резюме специалиста 

Integration solutions for SAP systems. ABAP programming.
Development of integration mechanisms using SAP XI / PI. Development of WorkFlow. Development of ABAP Web Services. Use of standard adapters: XI Proxy, XI, IDoc, RFC, File / FTP, JMS, JDBC, SOAP. Development of interfaces RFC (BAPI), ALE, IDoc, EDI, XI Proxies. Administration (transport systems, background tasks, roles, etc.), System Administration SAP XI / PI (Basis). Designing database. Develop applications in ABAP: Reports, FM, Group Functions, Pool modules, Object-oriented programming, ABAP WebDynpro. Application optimization, code refactoring. Extensions: BADI, User Exits, Enhancement point. Download/Upload data LSMW: Batch Input, Standard Batch Input, BAPI, IDoc's. Develop reporting (ALV, templates MS Office, Adobe Forms).

Communication skills, ability to work as a team member or individually, creative approach to work

 

Календарь доступности специалиста

 

Описание проектного опыта 

November 2013 – February 2014

Berlin-Chemie/Menarini, Kaluga

Описание проекта: New implementation based on ECC 6.06.
Технологический стэк: FI, CO, MM, SD, PP, QM, LE
Роль: Consultant.
Обязанности:
• Development of programs and reports for components QM;
• Output forms development for components: QM;
• Development extensions for components QM.

January 2012 – May 2013

Gazprom, Moscow

Описание проекта: An Information Management System for Materials Management. Development and Implementation “Agency Activity” module for “Gazprom Komplektaciya” company based on SAP NetWeaver 7.02.
Технологический стэк: FI, CO, MM, SD, PM, FI-AA, FI-FM, FI-SL, PS, IM, SEM BW, DMS
Роль: Consultant.
Обязанности:
• Financial accounting module development;
• Development of programs and reports for components FI, FI-FM;
• Development extensions for components FI, FI-FM.

July 2011 – December 2011

“Lukoil” JSC, Moscow

Описание проекта: An Information Management System of Treasury. Project implementation “IMS Treasury” based on SAP NetWeaver 7.02.
Технологический стэк: FI, FI-TRM, FS-BP, TR-CM
Роль: Consultant.
Обязанности:
• Programs and reports development for components: FI, FI-TRM, FS-BP, TR-CM;
• Output forms development for components: FI, FI-TRM, FS-BP, TR-CM;
• Communication interfaces development for components: FI, FI-TRM, FS-BP, TR-CM;
• Extensions development for components: FI, FI-TRM, FS-BP, TR-CM.

June 2011 – July 2011

“Aeroflot” JSC, Moscow

Описание проекта: Implementation. Project implementation IMS Aeroflot based on SAP NetWeaver 7.00
Технологический стэк: FI, CO, MM, SD, PM, FI-AA, PS, IM, DMS
Роль: Consultant.
Обязанности:
• Programs and reports development for components: MM, SD, PM;
• Output forms development for components: MM, SD, PM;
• Extensions development for components: MM, SD, PM.

April 2010 – May 2011

Gazprom, Moscow

Описание проекта: An Information Management System of Investment. Implementation of the project "IMS Investment" based on SAP NetWeaver 7.00.
Технологический стэк: FI, CO, MM, SD, PS, IM, RPM, BW, EP, MDM
Роль: Team Leader of integration and MDM solutions.
Обязанности:
• The analysis of the project's integration tasks;
• Selection the approach and the mechanism to solve the tasks set;
• Segregation of the integration tasks between the project's integration team members;
• The Development of the integration tasks;
• Performing the control over the quality of the developed integration tasks.

March 2010 – May 2011

Tatneft, c.Almetevsk

Описание проекта: Implementation of the project «RPM» based on SAP NetWeaver 7.00.
Технологический стэк: FI, CO, MM, SD, PS, IM, RPM, BW, EP, MDM
Роль: Consultant.
Обязанности:
• The analysis of the project's integration tasks;
• Selection the approach and the mechanism to solve the tasks set;
• Segregation of the integration tasks between the project's integration team members;
• The Development of the integration tasks;
• Performing the control over the quality of the developed integration tasks.

August 2009 - June 2010

Tatneft, c.Almetevsk

Описание проекта: Integration of FI-HR-CO. Transfer payroll data to FI system "Integration of FI-HR-CO»
Технологический стэк: HR, FI, CO
Роль: Senior Consultant.
Обязанности:
• Develop of the integration interface of payroll data between HR (SAP NetWeaver 6.40) and FI (SAP NetWeaver 7.00).

August 2009 - June 2010

Tatneft, c.Almetevsk

Описание проекта: Implementation of the project "Investment Management" based on mySAP ERP 2005.
Технологический стэк: FI, CO, MM, SD, PM, FI-AA, FI-FM, FI-SL, PS, IM
Роль: Senior Consultant.
Обязанности:
• Develop of the integration interface: Projects, WBS-elements and accounting system of SAP ERP2005 with a group of non-SAP systems.

August 2009 - February 2010

OAO Tatneft, c.Almetevsk

Описание проекта: Circulation of Personnel Administration for 14 departments based on mySAP ERP 2004.
Технологический стэк: HR
Роль: Senior Consultant.
Обязанности:
• Develop the integration interface of the personnel administration SAP ERP2004 with non-SAP system based on Oracle database.

February 2009 - February 2010

OAO Tatneft, c.Almetevsk

Описание проекта: Circulation of "2OGPD".
Технологический стэк: FI, CO, MM, SD, PM, FI-AA, FI-FM, FI-SL, PS, FS-BP
Роль: Senior Consultant.
Обязанности:
• Develop an automated synchronization interface of vendors, customers, materials, staff and the subsequent creation Business Partners, vendors and customers from the staff data.

July 2008 - December 2009

Tatneft, c.Almetevsk

Описание проекта: Circulation of IMS "Tatneft Real Estate" 4 Oil and gas production department.
Технологический стэк: FI, CO, RE-FX, FI-AA, FI-SL, FI-FM, FS-BP
Роль: Senior Consultant.
Обязанности:
• Development of the data synchronization between RE-FX and FI-AA: Fixed Assets;
• Development of the data synchronization between RE-FX and FI-AA: Cost Center.

August 2007 - December 2008

Tatneft, c.Almetevsk

Описание проекта: Implementation "3OGPD" and upgrade solutions from 4.6C to ERP2005 system.
Технологический стэк: FI, CO, MM, SD, PM, FI-AA, FI-FM, FI-SL, PS, FS-BP
Роль: Senior Consultant.
Обязанности:
• Development of download master data and balances for the component FI-AA;
• Development of download and synchronization of vendors, customers and materials data’s.

April 2006 - July 2008

Tatneft, c.Almetevsk

Описание проекта: The implementation of IMS "Tatneft Real Estate".
Технологический стэк: FI, CO, RE-FX, FI-AA, FI-SL, FI-FM, FS-BP
Роль: Consultant.
Обязанности:
• Development of to download interfaces for contracts, buildings, properties, Rental Objects of RE-FX;
• Development of download master data and balances for the component of FI-AA;
• Development of reports and forms for the components of FI-AA, RE-FX;
• Development of the data synchronization mechanism between RE-FX and FI-AA.

November-November 2006

Tatneft Drilling, c.Almetevsk

Описание проекта: Implementation of IMS “Tatneft Drilling” based on mySAP ERP 2005.
Технологический стэк: FI, CO, MM, SD, PM, FI-AA, PS
Роль: Consultant.
Обязанности:
• Development and enhancement for DMS module.

February - November 2006

Tatoylgaz, c.Almetevsk

Описание проекта: Implementation of IMS Tatoylgaz based on mySAP ERP 2005.
Технологический стэк: FI, CO, MM, SD, PM, FI-AA, FI-FM, FI-SL, PS, IM, SEM BW, DMS
Роль: Consultant.
Обязанности:
• Development of reports for the components of MM, SD, PM;
• Development of output forms and forms for the components of MM, SD;
• Development of communication interfaces for the components of SD, DMS, FI-AA;
• Development of extensions for components MM, SD.

February - July 2006

LeninogrskNeft, c.Leninogorsk

Описание проекта: Implementation of "personnel administration" based on mySAP ERP 2004.
Технологический стэк: HR
Роль: Assistant Consultant.
Обязанности:
• Development of reporting forms for the components of HR.

February - June 2006

Tatneft, c.Leninogorsk

Описание проекта: Implementation of IMS URNiN based on mySAP R / 3 4.7.
Технологический стэк: SD, MM, FI, CO
Роль: Assistant Consultant.
Обязанности:
• Development of reporting forms for the component SD.
Оставьте отзыв
Заполните обязательные поля *.
1 2 3 4 5

Находится в разделах